The voltage change rate of the Steyr generator set is about 20-40%. Industrial and household load requirements remain essentially constant. Therefore, as the load current increases, the field current must be adjusted accordingly. Although the trend of the adjustment characteristics is opposite to the external characteristics, for inductive and purely resistive loads, the trend is rising, while for capacitive loads, the trend is usually decreasing.
1. When the Steyr generator is working, the operation between two fuel injections is called a work cycle. In four strokes, this cycle needs to be accomplished by four different strokes of the piston, namely suction, compression, expansion and exhaust.
2, it combines inhalation, exhaust, compression, expansion, is a two-stroke device. During the two-stroke cycle operation, the piston rises from the bottom (both bottom dead center), the intake port and the exhaust valve are open, fresh air is charged into the cylinder, and the residual exhaust gas from the last stroke can be exhausted;
< p=""> 3. When the piston is running up to about one-fifth of its stroke, the intake and exhaust valves are closed, and the temperature and pressure rise to a very high value;4. When the piston reaches the top of the stroke (ie, top dead center), the fuel valve injects fuel into the high temperature air in the cylinder, the fuel burns, and the pressure rises rapidly, whereby the expanded gas forces the piston Move down during the power stroke;
5. When the piston moves down to half of its stroke, the exhaust valve opens and the high temperature gas begins to flow out due to its own pressure. It is good for fresh air to enter the air inlet, open as the piston descends further, and then start another cycle.
Precautions
Steyr generator sets and other electrical equipment usually have a shipping box. When handling, care should be taken to attach the lifting cable to the appropriate part of the machine and lift it gently.
When lifting the Steyr generator set for installation, first connect the protruding lifting points on the chassis, then check if it is firmly hung, and if there is any welding Cracks, whether the bolts are tightened, etc. Once the machine is off the ground, use a guide cable to prevent the wire rope from kinking or the machine swinging. When the unit is lowered, place it where it can carry the weight of the generator. If the generator is to be hoisted, a single point suspension shall be installed. The standard covered machine has a single point suspension. When the Steyr generator set is shipped to its destination, it should be placed in the warehouse if it needs to be stored. If there is no warehouse to be stored in the open air, the box should be raised to prevent rainwater erosion. The box should be covered with rainproof shed cloth to prevent sun and rain from damaging the equipment.
Related News
- Inspection project on Shangchai diesel generator set
- How to maintain the Steyr diesel engine unit in winter
- What are the problems with the inferior Weifang generator set?
- Safe operation of Yuchai generator set
- Notes on the assembly and unloading of silent trailer generators
- National diesel generator set noise treatment scheme
- How should we maintain the Weifang generator set in the cold winter?
- Silent box reduces the noise impact of Shangchai diesel generator set
- How much is the maintenance of low noise generator set
- How to use Weifang generator set?
- Fuel generator fuel supply system
- Introduction to domestic diesel generator sets quotation
- Fuel generator set classification and startup precautions
- Why is the low noise generator so popular?
- Benefits and maintenance of fuel generator sets
- Shangchai diesel generator fuel supply system
- Just to judge the fault of Shangchai diesel generator set from black smoke
- How is the Steyr generator set used?
- Detailed structure of silent trailer generator set